The arm is now finished and ready for testing. This arm needs to be able to grab rings from the first level and deposit them onto the second level of the rack, all while maintaining balance and structural integrity. The arm can move up and down and the grabber on the end can rotate, giving us the degrees of movement we need in order to place the rings.
No comments:
Post a Comment